NG ENERGY ANNOUNCES ARUCHARA-6 WELL RESULTS AT MARIA CONCHITA AND SPUDDING OF ENCANTADO-1X AT SINÚ-9
Image File
Original HTML

Maria Conchita Block - Aruchara-6 Well Results

The Aruchara-6 well has been successfully drilled to a total depth of 9,352 feet, hitting the H1 target as designed and passing through the H2, H3, H4, H5 and H6 zones, with all zones showing positive results of gas at surface and through wireline logs. The well has been completed and connected to the central processing facility ("CPF"), with well performance evaluation now underway through the CPF and new gas volumes being sold into the Colombian marketplace.

During initial flow testing through the CPF, Aruchara-6 produced at rates of up to 8.7 MMcf/d gross (6.96 MMcf/d net), on a 30/64 choke at an average tubing head pressure of 780 psi. The well is now on production, with gas volumes being sold into the Colombian marketplace.

With Aruchara-6 on production, total field production at Maria Conchita is expected to increase to 23.0 MMcf/d gross (18.4 MMcf/d net), compared to 16.0 MMcf/d gross (12.8 MMcf/d net) prior to the addition of the well. This is expected to bring the combined Company net production across Maria Conchita and Sinú-9 to approximately 29.1 MMcf/d. Net production volumes for Maria Conchita reflect the Company's 80% working interest under private agreements, rather than the contractual interest registered with Agencia Nacional de Hidrocarburos (the "ANH").

Gas volumes in excess of those sold under the Company's existing contracted offtake agreements are being sold into the Colombian marketplace at average prices of approximately US$14.00–16.00/Mcf, with some volumes exceeding US$20.00/Mcf, reflecting the premium Colombian natural gas pricing environment. The Company's contracted offtake agreements at Maria Conchita cover volumes up to 15.0 MMcf/d gross, with all incremental volumes above this threshold sold at spot prices.

Maria Conchita Block - CPF Upgrades

As total field production at Maria Conchita approaches the CPF's 30 MMcf/d processing capacity, the Company's infrastructure partner, GTX International Corp. ("GTX"), is advancing a series of upgrades designed to increase the reliability of the CPF as it operates at or near capacity. Prior to the end of October, an additional compressor will be installed to accommodate upcoming production volumes with a greater level of reliability. GTX is also in the process of implementing improvements to the heat exchangers and the cooling facility, with further upgrades to the dehydration facility expected to be completed by the end of October 2026.

Together, these investments are intended to ensure the CPF operates reliably as the facility approaches full capacity, supporting sustained production growth from the Aruchara well series while enhancing uptime and operating efficiency across the Maria Conchita Block.

Sinú-9 Block – Operational Update

At the Sinú-9 Block, Maurel & Prom Colombia Sociedad Limitada, as Operator of the consortium formed with the Company through Operadora NGE (the "Sinú-9 Consortium"), spudded the Encantado-1X well on October 6, 2026. Encantado-1X is the next well in the Sinú-9 Consortium's 2026 drilling program, and drilling is currently underway. The Sinú-9 Consortium expects that, following completion of Encantado-1X, at least one additional well will be drilled at Sinú-9 this year.

The Company views Encantado-1X as an important well for the continued delineation of the Sinú-9 Block for several reasons. The well is expected to help define the southern limits of the reservoir and provide depth calibration across the block. The area is anticipated to be of higher pressure than previously drilled locations, which management expects to have a positive impact on production rates. Encantado-1X is also expected to confirm the presence of natural gas in the Pre-CDO formation and verify the potential for liquids within the reservoir.

In support of the Sinú-9 Consortium's drilling program, commissioning of the first loop of the pipeline from the Jobo connection point, constructed by the Company's infrastructure partner INFRAES S.A.S E.S.P., is now complete. Gross transportation capacity at the Sinú-9 Block has increased from 30.0 MMcf/d to between 40.0 and 45.0 MMcf/d, representing net entitlement to the Company of between 15.6 and 17.6 MMcf/d.

Jorge Fonseca, Chief Executive Officer of NGE, commented: "Aruchara-6 has delivered positive gas results and is now tied into our main processing facility and producing, having flowed at up to 8.7 MMcf/d during well testing. The addition of the well is expected to bring total field production at Maria Conchita up to 23.0 MMcf/d. With the block now approaching the capacity of our processing facility, the upgrades GTX is completing over the coming weeks will ensure the CPF runs reliably at these higher throughput levels. At Sinú-9, Maurel & Prom Colombia Sociedad Limitada, as Operator of the Sinú-9 Consortium, spudded Encantado-1X on October 6th and drilling is now underway – a well we believe is important for defining the southern limits of the reservoir, testing a higher-pressure area of the block and confirming the presence of gas in the Pre-CDO formation. With at least one further well planned by the Sinú-9 Consortium before year-end, we are finishing 2026 with real momentum across both of our assets."

About NG Energy International Corp.

NG Energy International Corp. is a growth-orientated natural gas exploration and production company focused on delivering long-term shareholder and stakeholder value through the discovery, delineation and development of large-scale oil and gas fields in the Americas, supporting energy transition and economic growth. NGE's team has extensive technical and capital markets expertise with a proven track record of building companies and creating significant value in North and South America. In Colombia, the Company, through its indirect wholly-owned subsidiary, Operadora NGE, which operates in Colombia through its registered branch, is executing on this mission with a rapidly growing production base and an industry-leading growth trajectory, delivering natural gas into the premium-priced Colombian marketplace with a goal of being a material supplier of clean natural gas to Colombia and a broader vision of becoming a global energy platform business and providing prosperity for all stakeholders. Over the past 3 years, the Company has successfully raised and deployed over US$200 million in debt and equity, monetized 40% of one of its assets for US$150 million in cash and has partnered in the construction and commissioning of 3 gathering, processing and treatment facilities and associated pipelines with significant capital contributions from insiders who currently own approximately 32% of the Company. For more information, please visit SEDAR+ (www.sedarplus.ca) and the Company's website (www.ngenergyintl.com).

Cautionary Statement Regarding Forward-Looking Information

This news release contains "forward-looking information" and "forward-looking statements" (collectively, "forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release, including, without limitation, statements related to total field production at Maria Conchita, total net production across Maria Conchita and Sinú-9, the timeline for completion of GTX's upgrades to the CPF and the drilling of additional wells at Sinú-9. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Factors that could cause actual results to differ materially from those anticipated in these forward-looking statements are described under the caption "Risk Factors" in the Company's most recent Management Discussion and Analysis and its Annual Information Form dated March 27, 2026, which are available for view on SEDAR+ at www.sedarplus.ca. These risks include but are not limited to, the risks associated with the oil and natural gas industry, such as exploration, production and general operational risks, the volatility of pricing for oil and natural gas, the inability to market natural gas production and changes in natural gas sale prices, changing investor sentiment about the oil and natural gas industry, any delays in production, marketing and transportation of natural gas, drilling costs and availability of equipment, regulatory approval risks and environmental, health and safety risks. Forward-looking statements contained herein are made as of the date of this news release, and the Company disclaims, other than as required by law, any obligation to update any forward-looking statements whether as a result of new information, results, future events, circumstances, or if management's estimates or opinions should change, or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.

Class (B2B/B2C)
B2B
Ingest Status
Rewritten
Dedupe hash
prn_302910701
Press Eligible
Yes
Press Eligible Reason
Natural gas production, drilling, and infrastructure updates from an energy company.
Source Name
Unknown Company
Original Summary

<p>Aruchara-6 successfully drilled, completed and tied into the CPF at Maria Conchita and is now producing The well has produced at rates of up to 8.7 MMcf/d gross (6.96 MMcf/d net) during initial flow tests done through the CPF, with a choke of 30/64 and average tubing head pressure of 780...</p>

Image URL
https://mmx.prnewswire.com/media/MS2014688/NG-Energy-International-Corp-NG-ENERGY-ANNOUNCES-ARUCHARA-6-WEL.jpg?id=OA3022700&p=facebook
Content Hash (SHA-256, erste 32 hex)
1d7aa2af95a1bfa606c531faf7586068